1.md 495 B

Invalid BalloonPanelView positioning #126

Pre–requirements

  1. Click "Scroll to the squares" button.
  2. There should be 4 red squares displayed in this test.

Test

  1. Click "Attach the panels" button.
  2. There should be 4 balloon panels displayed in this test.
  3. Each balloon panel should be perfectly attached to a square.
  4. Each balloon panel's triangle should hit directly into the spot (square).